Project Description
This project stabilized and protected Chester’s Island bird rookery in Matagorda Bay using beneficial use sediment sourced from the Matagorda Ship Channel Deepening Project.
This project stabilized and protected Chester’s Island bird rookery in Matagorda Bay using beneficial use sediment sourced from the Matagorda Ship Channel Deepening Project.
The project conducted high-resolution geophysical surveys offshore in Region 4 and the Lower Texas Coast.
To construct Breakwaters and Oyster Reef to stabilize the eroding shoreline of Oliver Point.
This GLO-led project included engineering and design of a living shoreline from the mouth of Powderhorn Lake southeast to the terminous of Boggy Bayou to protect and preserve critical habitats and marshes from high energy wave action.
This project aims to restore critical nesting habitat along PINS, through beneficial use of dredge material from the dredging of the Mansfield Channel.
Calhoun County will construct additional park amenities at Olivia Haterius Park.
This project will construct a shoreline protection structure (subterraneous stone revetment) that connects the existing stone revetment terminating near the southeastern extent of Gulf Beach Drive into the CR257 bridge abutment.
The purpose of this project is to develop a GIS database and software solution for Texas General Land Office (GLO) for the public presentation of coastal sediment management projects in Texas waters.