Keller Bay Feasibility Study and Alternatives Analysis Project
Swan Point Resiliency and Restoration
Project Description
Calhoun County holisticly used dredge material for environmental restoration in the Swan Point area, located at the northern end of San Antonio Bay.
Basics
Classification
Contacts
Timeline
Boggy Bayou Nature Park Shoreline Protection and Restoration-Phase 2
Project Description
This project was Phase 2 of an ongoing study being conducted to reduce and mitigate for the observed erosion at Boggy Bayou and will include development of all the necessary bid package components.
Basics
Classification
Contacts
Timeline
Packery Channel Nature Park Shoreline Enhancement
Project Description
Nueces County Coastal Parks Department will provide a resilient living shoreline by incorporating gray-green infrastructure. In addition to the living shoreline, a raised pier structure will be constructed for public access.
Basics
Classification
Contacts
Timeline
Magnolia Beach CAP 206
Project Description
This project conducted an ecosystem restoration feasibility study with the USACE under Section 206 of the Water Resources Development Act of 1996 to examine the potential for restoration of a large complex of salt marshes in the Magnolia-Indianola area.
Basics
Classification
Contacts
Timeline
Dressing Point Island and Shoreline Restoration Project Phase 1
Project Description
This two phase project will result in a breakwater that will encompasses three quarters of the island phase 1 and the restoration of the island mass increasing the footprint from 4 acres today to a total of 11 acres.
Basics
Classification
Contacts
Timeline
CEPRA Economic and Natural Resources Benefit Cost Study (Cycle 12-13)
Project Description
CEPRA statute mandated economic and natural resources benefit cost study covering CEPRA cycles 12-13.
Basics
Classification
Contacts
Timeline
Children's Beach SR Ph. 1
Project Description
This project was Phase 1 of a multi phase project to protect Children's Beach at Isa Blanca County Park.
Basics
Classification
Contacts
Timeline
Port Lavaca Lighthouse Beach Phase I
Project Description
This project is a first phase feasibility study and coastal engineering analysis to evaluate existing conditions and hydrodynamic processes for the project site and characterize design parameters.
Timeline
Port Aransas Nature Preserve Restoration
Project Description
This project completed an alternative analysis to address upland flats restoration within the scour channel created by Hurricane Harvey adjacent to the bulkhead west terminus at the Nature Preserve (Charlie’s Pasture).