Preserving & Enhancing Beaches By Amending Federal Beach & Dune Permits

Project Description

This project amended two federal USACE permits held by the Park Board of Trustees of the City of Galveston that authorize beach and dune restoration projects along the seawall and west of the seawall extending west to the San Luis Pass Inlet.

Basics

Classification

Contacts

Timeline

Aransas Bay Bird Island Restoration and Protection Ph II

Fred Stone Park Permitting and Design Project

Project Description

The project will feature an innovative design of a dynamic living shoreline protection system. This includes strategically placed nearshore segmented breakwaters and an enhanced shoreline with the creation of native marsh habitat.

Basics

Classification

Contacts

Timeline

Laguna Point Feasibility Study and Alternative Analysis Project

Project Description

This project will aim to develop concepts to protect, stabilize and enhancing critical coastal habitat and upland park infrastructure. Living shorelines, consisting of low crested rock or concrete breakwaters, shoreline fill (harvested from a nearby source), and planting, will be evaluated along with other potential alternative solutions such as groins and pocket beaches to achieve these goals.

Basics

Classification

Contacts

Timeline

Petronilla Wetlands

Project Description

Nueces River Authority will 1) acquire ~50 acres from the City of Robstown and ~250 acres from a private landowner; 2) procure an engineer to complete a feasibility study, alternatives analysis, and engineering designs for both properties.

Basics

Classification

Contacts

Nueces River Authority
Travis Pruski

Timeline