Project Description
This project included data collection, design work and bid package development for improvements at Andy Bowie Park.
This project included data collection, design work and bid package development for improvements at Andy Bowie Park.
This project widened the City of South Padre Island's beach using dredge material.
This project conducted data collection, initial engineering and design, and permitting for a shoreline protection structure along the The Nature Conservancy’s Francine Cohn Preserve’s shoreline in Corpus Christi Bay.
This project constructed stabilization measures for the 620 linear feet of eroding shoreline.
The Gordy Marsh project built approximately 9,000 linear feet of shoreline and applied long term shoreline protection to the project site by building a nearshore breakwater to maintain the existing shoreline and protect native wetlands.
This project constructed pedestrian beach stabilization measures in the Village of Surfside Beach.
This project created a final engineering design template for the North Breach area which was damaged during Hurricane Harvey. Alternatives will be investigated to create a more resilient structure.
Recognizing the need for additional information from field measurements, this data collection and research project gathered new field data to further understanding of nearshore wave and current conditions in Region 1 of the Texas Coast.
This project restored approximately 2 miles of dune with 20 feet of vegetation planting at the tow of the dunes seaward all of which will occur in one-mile tracs annually.
This project will implement Phase III of a habitat restoration and shoreline stabilization project by completing 100% engineering and constructing 10,340 feet of breakwater to provide adjacent to the Gulf Intracoastal Waterway (GIWW) in Matagorda County.