Coast

Oliver Point Shoreline Protection and Reef Restoration

Project Description

This project, Phase 1, initiated development of a restoration plan for Oliver Point and Oliver Reef and build a nearshore breakwater to protect 6,500 linear feet of shoreline and 5,200 linear feet of reef that will crown at or near Mean High Water.

Basics

Classification

Contacts

Timeline

Causeway Rookery Island Shoreline Protection Phase II

Project Description

The project entailed 3,400 linear feet of shoreline protection in the form of breakwaters around a bird rookery island. The system will include 9 breakwater segments of various lengths between 175 to 1,050 feet in length.

Basics

Classification

Contacts

Timeline

Effects of Hurricane Ike Study, Phase 2 (completed) and Phase 3

CEPRA Economic Studies Report

Project Description

The Texas Legislature requires the Texas General Land Office (GLO) to report the economic and natural resource benefits derived from Coastal Erosion Planning and Response Act (CEPRA) funding every biennium.

Basics

Classification

Contacts

Timeline

Isla Blanca Park BN with BUDM 2012 Event

Project Description

This was a beach nourishment project using dredged material from the Brownsville Ship Channel and annual beach monitoring surveys.

Basics

Classification

Contacts

Timeline