CR257 Shoreline Stabilization Project Berm

Project Description

This project conducted shoreline protection and road reconstruction to repair the CR 257 roadbed along Follet’s Island to pre-Hurricane Ike condition and constructed 8.5 miles of buried revetments along the exposed edges of the road.

Basics

Classification

Contacts

Timeline

Triangle Tree Rookery Island Shoreline Protection Phase II

Sylvan Beach Shoreline Protection and Beach Nourishment

Project Description

The project included construction of revetment and pocket beaches at Sylvan Beach.

Basics

Classification

Contacts

Timeline

Boggy Nature Park Shoreline Protection Phase I

Project Description

This project is Phase 1 of building shoreline protection at Boggy Nature Park and will include data collection, coastal engineering analysis, and alternatives development and analysis.

Basics

Classification

Contacts

Timeline

Rockport Beach Harvey Repair

Project Description

This project mitigated damage from Hurricane Harvey to Rockport Beach by restoration of the beach to its pre-disaster design, function, and capacity by placement of 12,000 cubic yards of beach quality material along 4,680 feet of the engineered beach.

Basics

Classification

Contacts

Timeline