Coast

Improvements to the Wastewater Treatment in Western Nueces County

Project Description

Nueces River Authority will upgrade two existing wastewater treatment plants with new equipment and develop a Regional Plan Report utilizing the Regional Plant feasibility study and stakeholder input to meet future consumer needs.

Basics

Classification

Contacts

Nueces River Authority
Travis Pruski

Timeline

SPI Beach Nourishment with Beneficial Use of Dredge Material

Project Description

This project placed BUDM material to reduce and possibly prevent loss of property and public infrastructure and preserve beach on South Padre Island.

Basics

Classification

Contacts

Timeline

West Galveston Island Beach Nourishment Hurricane Rita FEMA Repair Project

Project Description

This beach nourishment project addressed storm damage to existing engineered beaches.

Basics

Classification

Contacts

Timeline

Aransas NWR Dagger Point Shoreline Protection Phase I

Project Description

This project produced preliminary engineering and design for habitat protection at Dagger Point.

Basics

Classification

Contacts

Timeline

CAP 204 Galveston Island West End Beach Nourishment

Project Description

This project initiated the first of many nourishment projects focused on the beaches of the west end of Galveston Island. The footprint is approximately 9,500 linear feet of beachfront being nourished with dredge material from the Houston Ship Channel.

Basics

Classification

Contacts

Timeline