Project Description
This project conducted beach renourishment of Babe’s Beach along the Galveston Seawall west of 61st Street.
This project conducted beach renourishment of Babe’s Beach along the Galveston Seawall west of 61st Street.
This project provided engineering services during the construction phase of the Piper Channel Segment of the Shoreline Protection Project at the Port Aransas Nature Preserve.
This project conducted a Texas shoreline change project to identify and quantify eroding areas.
This project included gathering all the necessary bid package components to initiate work at Magnolia Beach.
This project continued work at West Bay Bird Island which was restored by dredging a relief channel and using dredged materials to rebuild lost habitat.
This project restored and maintained an increasingly popular but critically-eroded public beach in Matagorda County.
This project renourished approximately one mile of beach in the Village of Surfside, extending from the Freeport Jetties to Whelk Street.
This project was an economic and natural resource benefit-cost study of selected CEPRA Cycle 8-11 construction projects completed since the previous biennial economic/natural resources benefit-cost study.
This project will complete engineering and design for construction of up to 10 miles of rock breakwater along the shorelines of East Bay Bayou.
This project included preliminary engineering, alternatives analysis, and 70% construction design for a minimum of 900 linear feet in shoreline protection.