Coast

Port Lavaca Bayfront Peninsula Improvements

Project Description

The City of Port Lavaca continued its efforts to revitalize the popular Bayfront Peninsula by installing a concrete cap to seal the existing steel sheet pile bulkhead, and constructing 350 linear feet of concrete walkway atop the east wall bulkhead.

Basics

Classification

Contacts

Timeline

Palacios Public Fishing Pier Construction

Project Description

The City of Palacios constructed an approximately 350 linear foot fishing pier in South Bay Park to foster ecotourism.

Basics

Classification

Contacts

Timeline

Phase 2 Texas Coastal Management Performance Measurement System

Preliminary Evaluation of the Impacts of Dredging Activities on the Fate of Dioxin in the Houston Ship Channel

Project Description

Texas A&M University at Galveston studied the impacts of dredging operations on sedimentary processes in the Houston Ship Channel (HSC), a key component in the determination of the fate of dioxins in this system.

Basics

Classification

Contacts

Timeline

Oily Bilgewater Pumpout units - Rockport/Fulton & Port Aransas Harbors

Project Description

Texas A&M University, Corpus Christi designed, manufactured, shipped, installed, and started-up two (2) Mobile Bilge Pumpout Stations at Rockport-Fulton and Port Aransas Harbors.

Basics

Classification

Contacts

Texas A&M University - Corpus Christi
Jim Needham

Texas A&M University - Corpus Christi
Jim Needham

Timeline