Coast

Key Allegro, road and bay shore

Project Description

This project constructed a 1,150-foot concrete sheet pile bulkhead between the road and bay shore.

Basics

Classification

Contacts

Timeline

GIWW-Rollover Bay Reach Beneficial Use of Dredged Material State FY2015 & 2016 events

Project Description

This beach nourishment project beneficially utilized dredged material from the fall 2014 Corps maintenance of the Gulf Intra-Coastal Waterway (GIWW) Rollover Bay Reach.

Basics

Classification

Contacts

Timeline

Economic and Natural Resource Benefits Report

Project Description

This project quantified the economic benefits associated with CEPRA Cycle 7 and Cycle 8 construction projects.

Basics

Classification

Contacts

Timeline

Galveston Seawall BUDM West of 61st to 103rd Street

Project Description

This proejct nourished the beach at the Galveston Seawall from 61st to 103rd street using dredge material.

Basics

Classification

Contacts

Timeline

Dellanera Park Beach Nourishment

Project Description

This was a beach nourishment project at Dellanera Park beach.

Basics

Classification

Contacts

Timeline