Project Description
This project constructed a 1,150-foot concrete sheet pile bulkhead between the road and bay shore.
This project constructed a 1,150-foot concrete sheet pile bulkhead between the road and bay shore.
This beach nourishment project beneficially utilized dredged material from the fall 2014 Corps maintenance of the Gulf Intra-Coastal Waterway (GIWW) Rollover Bay Reach.
This project quantified the economic benefits associated with CEPRA Cycle 7 and Cycle 8 construction projects.
This proejct nourished the beach at the Galveston Seawall from 61st to 103rd street using dredge material.
This was a beach nourishment project at Dellanera Park beach.
This project completed permitting for beach nourishment and new borrow areas based on CEPRA 1628 Sediment Studies. A permit was executed for East and West Galveston Island.
This two-phase project finalized the engineering and design and construction of an approximately 3,500 linear foot beach nourishment and dune restoration project at Caplen Beach west of Rollover Pass on Bolivar Peninsula.
This investigative study determined the viability of the Park Board and City of Galveston's ownership and operation of a hydraulic dredge to provide ongoing beach nourishment opportunities.
This upland sand source assessment feasibility study determined the viability and availability of potential upland sand sources located on Galveston Island that may be utilized on future coastal restoration projects.