Coast

Bayport Demonstration Marsh Circulation Improvement and Monitoring

Project Description

The Port of Houston Authority constructed footbridges and observation platforms throughout the Demonstration Marsh to better study the progress of the marsh. The project also erected interpretative signage.

Basics

Classification

Contacts

Timeline

Brazoria County Flood and Rainfall Gauges

Project Description

Brazoria County installed four flood and rainfall gauges which report "real-time" water levels and rainfall events via a radio signal to a base station, which automatically enters the collected information onto a web page.

Basics

Classification

Contacts

City of South Padre Island
Richard Tillman

Timeline

Armand Bayou Watershed Plan - Phase IV Implementation Project

Aerial Photography for Orange Co. Master Drainage Plan (98-013)

Project Description

Orange County derived information from the aerial photos to identify potential dredged material disposal sites and in the preparation of alternatives analyses and mitigation plans.

Basics

Classification

Contacts

Orange County
Susan Henderson

Timeline

51st Street Marsh Project (98-011)

Project Description

City of Galveston planted native, naturalized, and salt tolerant shrubs and trees around the perimeter of the marsh and on high ground interspersed between ponds.

Basics

Classification

Contacts

City of Galveston
Margaret Tindel

Timeline