Baytown Nature Center - Crystal Bay Shoreline Stabilization

Project Description

The City of Baytown constructed a 500' concrete riprap breakwater that connects to the existing breakwater on Burnet Bay to help control the ongoing erosion along the Crystal Bay shoreline.

Basics

Harris
City of Baytown
13
09-036-000-3353

Classification

CMP
306A
Coastal Habitat

Timeline

Closed
2010

Contacts

City of Baytown
Scott Johnson

Budget/Costs

$165,750.00