Project Description
The City of Baytown constructed a 500' concrete riprap breakwater that connects to the existing breakwater on Burnet Bay to help control the ongoing erosion along the Crystal Bay shoreline.
Basics
Harris
City of Baytown
13
09-036-000-3353
Classification
CMP
306A
Coastal Habitat
Timeline
Closed
2010
Project Assets
Contacts
Budget/Costs
$165,750.00