County/Region:
Galveston
Project Partner/Recipient:
Texas General Land Office
Summary:
County/Region:
Matagorda
Project Partner/Recipient:
Ducks Unlimited, Inc.
Summary:
This two phase project will result in a breakwater that will encompasses three quarters of the island phase 1 and the restoration of the island mass increasing the footprint from 4 acres today to a total of 11 acres.
County/Region:
Upper Coast
Project Partner/Recipient:
Galveston Bay Foundation
Summary:
Galveston Bay Foundation developed, produced, and installed over 20 interpretive signs, which highlight the natural, historical, and cultural resources of Galveston Bay.
County/Region:
Upper Coast
Project Partner/Recipient:
Galveston Bay Foundation
Summary:
Galveston Bay Foundation developed, produced, and installed twenty (20) interpretive signs, which highlight the natural, historical, and cultural resources of Galveston Bay.
County/Region:
Galveston
Project Partner/Recipient:
Bureau of Economic Geology, University of Texas at Austin
Summary:
The University of Texas provided critical information for the monitoring and management of the coastal dune and beach system along the Galveston County shoreline.
County/Region:
Galveston
Project Partner/Recipient:
Texas A&M University at Galveston
Summary:
Texas A&m University at Galveston built dunes, installed vegetation and culverts at strategic locations to channel stormwater runoff from the street away from the dunes and beach, and constructed dune walkovers to allow for improved pedestrian access.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
The City of South Padre Island restored dunes on public beaches by installing sand fencing along a one-mile corridor and planting native dune vegetation.
County/Region:
Galveston
Project Partner/Recipient:
City of Galveston
Summary:
County/Region:
Coastwide
Project Partner/Recipient:
General Land Office
Summary:
County/Region:
Coastwide
Project Partner/Recipient:
Halff
Summary:
Halff will conduct a creek diversion feasibility analysis, conduct green stormwater engineering designs, and gain commitments from target communities toward the implementation of the State of Texas Coastal Nonpoint Source Pollution program.
County/Region:
Lower Coast
Project Partner/Recipient:
Coastal Bend Bays & Estuaries Program
Summary:
Coastal Bend Bays and Estuaries Program secured advertising, event security, on-site first aid, permitting, event insurance, bus transportation of visitors from remote parking, rentals, and supplies and contractual costs associated with Earth Day Bay Day.
County/Region:
Galveston
Project Partner/Recipient:
Gulf Coast Protection District
Summary:
This project will complete engineering and design for construction of up to 10 miles of rock breakwater along the shorelines of East Bay Bayou.
County/Region:
Chambers
Project Partner/Recipient:
Texas General Land Office
Summary:
The project included an alternatives analysis to provide stabilization and restoration of the eroding bay shoreline.
County/Region:
Galveston
Project Partner/Recipient:
Park Board of Trustees of the City of Galveston
Summary:
Park Board of Trustees of the City of Galveston completed a wetland delineation survey, created a topographic map based on delineation results and built an approximately 2,500 linear feet, ADA-compliant interpretative trail.
County/Region:
Galveston
Project Partner/Recipient:
Park Board of Trustees of the City of Galveston
Summary:
The Galveston Park Board of Trustees built an approximately 1,200 square foot, accessible, free parking area for a minimum of three (3) vehicles.
County/Region:
Coastwide
Project Partner/Recipient:
Texas General Land Office
Summary:
County/Region:
Coastwide
Project Partner/Recipient:
Texas General Land Office
Summary:
This project quantified economic benefits associated with representative CEPRA Cycle 5 and Cycle 6 construction projects.
County/Region:
Coastwide
Project Partner/Recipient:
Texas General Land Office
Summary:
This project quantified the economic benefits associated with CEPRA Cycle 7 and Cycle 8 construction projects.
County/Region:
Coastwide
Project Partner/Recipient:
Texas General Land Office
Summary:
This project quantified the economic benefits associated with CEPRA Cycle 6 and Cycle 7 construction projects.
County/Region:
Coastwide
Project Partner/Recipient:
Texas General Land Office
Summary:
This project was an economic and natural resource benefit-cost study of selected CEPRA Cycle 8-11 construction projects completed since the previous biennial economic/natural resources benefit-cost study.