Project Description
The City of Port Arthur constructed an elevator tower and a 70-foot bridge at the existing boardwalk which provided improved access to the boardwalk for the disabled and at a location central to the ultimate length of the boardwalk. The tower is constructed of materials similar to those of the boardwalk and the elevator and stairs and have a small observation deck. The bridge spans the gap between the tower and the boardwalk and provides another viewing area of the ship channel.
Basics
Jefferson
City of Port Arthur
Classification
CMP
- 306A
Waterfront Revitalization & Ecotourism Development
Contacts
Timeline
Closed
2004
Budget/Costs
$100,000