This project conducted beach nourishment activities within a 600-foot construction width along 12-miles of shoreline in North Cameron County. The 600-foot construction width will include a 300-foot berm crest and a 300-foot slope to the toe of fill to match the existing permitted dimensions of beach nourishment templates to the south of Andy Bowie Park. This Project is Phase 1 of 2 which includes design and USACE permitting of the beach nourishment. Phase 2 will include coordination with the Army Corps of Engineers to include the proposed nourishment of 12-miles of shoreline in their future maintenance dredging plans for the Brazos Santiago Pass or from dredging of other adjacent borrow locations.
Basics
Cameron
Cameron County
Classification
CEPRA
Beach Nourishment with BUDM
Contacts
Timeline
Active