N. Cameron County BN Ph.1

Project Description

This project conducted beach nourishment activities within a 600-foot construction width along 12-miles of shoreline in North Cameron County. The 600-foot construction width will include a 300-foot berm crest and a 300-foot slope to the toe of fill to match the existing permitted dimensions of beach nourishment templates to the south of Andy Bowie Park. This Project is Phase 1 of 2 which includes design and USACE permitting of the beach nourishment. Phase 2 will include coordination with the Army Corps of Engineers to include the proposed nourishment of 12-miles of shoreline in their future maintenance dredging plans for the Brazos Santiago Pass or from dredging of other adjacent borrow locations.

Basics

Cameron
Cameron County

Classification

CEPRA
Beach Nourishment with BUDM

Contacts

Timeline

Active