Project Description
The City of Port Lavaca repaired 184 linear feet of bulkhead and topped it with a concrete cap, and installed 350 linear feet of 6-foot-wide concrete walkway along the west end of the east wall of the bayfront peninsula.
Basics
Calhoun
City of Port Lavaca
10
Classification
CMP
- 306A
Waterfront Revitalization & Ecotourism Development
Contacts
Timeline
Closed
2007
Budget/Costs
$100,000.00